Home >  Blog >  Can My Property Be Subdivided? Understanding Lot Size and Zoning in NSW

Can My Property Be Subdivided? Understanding Lot Size and Zoning in NSW

Posted by Binai Construction on 26 June 2025
Can My Property Be Subdivided? Understanding Lot Size and Zoning in NSW

If you’re a property owner in the Hornsby Shire area wondering, “Can my property be subdivided?”,  you’re not alone. With rising interest in property development across Sydney, many homeowners are exploring the potential to subdivide and unlock extra value in their land.

But before you start drawing up plans, it’s essential to understand the lot size requirements and zoning rules that apply, especially those set by Hornsby Council.

 

What is Property Subdivision?

Subdivision is the process of dividing one property into two or more lots. This might be to sell off part of the land, build a second dwelling (like a duplex or granny flat), or prepare for a future development project. In areas like Hornsby, subdivision is becoming more common due to increasing demand for housing and larger lot sizes compared to inner-city areas.
 

Zoning and Land Use in Hornsby Shire

In NSW, zoning is determined by your local council and guided by the NSW Planning Portal. In Hornsby Shire, residential zones such as R2 Low Density Residential or R3 Medium Density Residential are most relevant for subdivision.

Each zoning type outlines what you can and can’t do with your land. For instance, R2 zoning in Hornsby may allow for dual occupancy (two dwellings on one lot), but subdivision approval depends on factors like lot size, access, and council guidelines.

To check your zoning, you can visit the Hornsby Council zoning map or use the NSW Planning Portal.
 

Minimum Lot Size for Subdivision in Hornsby

One of the most important requirements for subdivision is meeting the minimum lot size. In Hornsby Shire, this can vary depending on the zoning and location of your property. For example:

  • R2 zoned land typically requires a minimum lot size of 500-600 sqm per lot for a subdivision to be considered.

  • For battle-axe or rear lots, extra requirements may apply regarding access and lot shape.

  • In heritage areas or environmentally sensitive zones, stricter rules may apply.

 

Always consult the Hornsby Council Local Environmental Plan (LEP) or speak to a local builder or planner to confirm the exact lot size requirements for your specific property.

 

The DA Process and Subdivision Approval

To subdivide in Hornsby, you’ll need to lodge a Development Application (DA) with the council. This includes submitting detailed plans, engineering reports, and demonstrating that the subdivision meets all planning controls.

The DA approval process in Hornsby can take several weeks to months, depending on complexity, zoning, and feedback from neighbours or council staff.
 

Is Subdivision Right for Your Property?

Whether you’re in Hornsby, Asquith, Mount Colah, Thornleigh, or surrounding suburbs, the key to a successful subdivision is understanding what’s possible before you start.

A feasibility study, including a zoning check, minimum lot size assessment, and potential development yield, can save time and money. An experienced builder or subdivision specialist familiar with Hornsby Council requirements is invaluable.
 

Ready to Explore Your Options?

At Binai Construction, we help clients across the Hornsby area navigate the subdivision process, from concept to DA approval and construction. Whether you’re looking to create a dual occupancy, detached duplex, or unlock development potential in your backyard, we’re here to help.

Contact us today to discover if your property can be subdivided and how we can help you maximise its value.
 

Author:Binai Construction
About: Binai Construction is a design, approval and construction company with the team having more than 40 years of experience offering professional renovation, alteration, addition/extension, upgrading services and property development for both our commercial and residential customers.
Tags:New BuildKnowdown & RebuildCustom HomesProperty DevelopmentDuplex

Latest News

What Our Clients Say

Our initial concerns were that the original quote we were given was going to blown out of our budget, as many other people who have used other builders have had this issue.

Binai was great in sticking to the budget he quoted us for. Another concern was that the builders may not finish in the estimated time that was given to us. Again, Binai a...

Mary and Daniel B - Ryde

We have completed over 400 projects, ranging form $30,000 to $50 million in residential, commercial and industrial projects.

We deliver great results for our clients, from design, approvals through to construction.

Our clients have trust in our expertise and our ability to deliver and handover projects on time.

CALL US TODAY

Binai Pty Ltd trading as Binai Construction